Return Merchandise Authorization
• All returned merchandise must have a Return Merchandise Authorization (RAM) number marked clearly on the outside of the package.
• You must obtain all RAM numbers from your authorized Incredible Technologies, Inc. distributor. Please have your Incredible Technologies, Inc. serial number available when calling for an RMA number.
• Merchandise returned without an RMA number will not be accepted.
• Advance replacement boards will be shipped to distributors or, at the distributor's request, will be shipped directly to the operator.
• Advance replacement boards will be billed to the distributor until Incredible Technologies, Inc. receives the returned board, at which time a credit will be issued.
• All repairs and/or replacements will be shipped within 24 hours of receipt or request (subject to availability).
This equipment complies with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment uses and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.
02/97
1 getting started..............................................2
SAME PACKAGE CONTENTS...............................2
RECOMMENDED TOOLS AND SUPPLIES........2
THE CABINET..........................................................2
Power Requirements............................................2
Monitor Requirements........................................3
Cabinet Selection.................................................3
Preparing a used cabinet for golden tee '97.................................................3
THE CONTROL PANEL...........................................3
Trackball Preparation.............................—.........4
Button Preparation..............................................6
THE GRAPHICS OVERLAY....................................6
Control Panel Overlay Installation...................6
Function Labels Overlay Installation...............6
Marquee Installation...........................................6
Control Panel Assembly......................................7
Printed Circuit Board (PCB)...............................7
Wire Harness........................................................7
Power Wires..........................................................8
Monitor Wires......................................................8
Speaker Wires.....................................................8
SYNC......................................................................8
Coin Doors, Test Switch, Service Button, and Volume Control Panel...................................9
Mars Light Hookup..............................................9
Final Check............................................................9
3 INITIAL START-UP............................................10
4 DIP SWITCH SETTINGS...................................10
5 OPERATOR MODE................................................11
VOLUME SETTINGS.............................................12
OPERATOR ADJUSTABLES................................12
Game Mode Selection........................................13
Game Resets.........................................................13
Attract Mode Sounds........................................13
Credits and Coin Door Settings.......................14
Delay Time Adjustment.....................................14
Skill Level Adjustment......................................15
Hole In One Contest Mode...............................15
Coin Door Protection Menu...............................16
GAME AUDITS.......................................................16
Display Coin Audits.............................................16
Display Game Selection Audits........................17
Pine Creek Audits...............................................17
Cora\ Ridge Audits..............................................17
Red Sands Audits...............................................18
Display Hardware Audits..................................18
Reset Audits........................................................18
LEADER BOARD MENU........................................18
Display Leader Board Menu..............................19
Clear Leader Board Menu.................................19
SYSTEM TESTS.....................................................19
Video Screen Tests...........................................20
Full GROM Checksum Test..............................20
Fast GROM Checksum Test..............................21
Video Ram Test...................................................21
Palette RAM Test...............................................21
Board Tests........................................................22
Sound Tests........................................................22
Control Panel Test.............................................22
Voltage Adjust Test..........................................22
appendix a
GENERAL TROUBLESHOOTING..........................24
VIDEO PROBLEMS...............................................25
SOUND PROBLEMS..............................................26
CONTROL PROBLEMS..........................................27
POWER-UP PROBLEMS........................................28
appendix b
appendix C
I/O and JAMMA SCHEMATIC..............................32
appendix d
WARRANTY INFORMATION................................34
GETTING STARTED
IIIS!
(1) Printed Circuit Board (PCB) Assembly
(1) Connecting Wire Harness (JAMMA)
(1) Trackball Assembly w/Metal Plate
(1) Trackball Cable Assembly
(3) Button Assemblies
(1) Marquee Styrene
(1) Marquee Plexiglas
(1) Control Panel Overlay
(1) Set of Function Labels
(1) Manual
Phillips and Slotted Screwdrivers Socket Set
Wire Cutters and Strippers
Pliers or Channel Locks
Electric Drill with 3/32", J", and 7/16" Bits
Chassis or Sheet Metal Punch
Small File
Razor Knife and Sharp Blades
Straight Edge
Staple Sur and Staples
Soldering Iron and 60/40 Resin Core Solder
Vacuum Cleaner
Assorted Fastening Hardware
Heat Shrink Tubing (3/32", 1/8", and 3/16")
Masking Tape or 4" Wire Ties if you do youft own painting, you'll need these paint supplies:
• Air Brush or Paint Sprayer
• Paint Roller and Pan
INSTALLATION PREPARATION
1. Check to see if all the needed parts have been included in your kit (See GAME PACKAGE CONTENTS .)
2. Do you have the necessary tools? (See RECOMMENDED TOOLS AND SUPPLIES.)
3. Do not work with any part of the system plugged in (lights, monitor, or power supply).
Power Requirements_
Make sure the game you have chosen to convert is able to supply all the required voltages for GOLDEN TEE '97.
5 amps 2 amps
warning!!!
The output level of many "regulated" switching power supplies actually vary with load. For this reason, the power supply from an old game may not be correctly adjusted for SÖLDEN TEE '97. This makes the existing power supply inappropriate and hazardous to your new game. Therefore, it is very important to adjust the +5 VDC supply WITHOUT connecting the PCB, then readjusting it later, after the PCB has been installed. Measure power on the PCB, on an I.e.. Damage will occur if the power supply is outside the acceptable limits (between 4.8 and 5.5 VDC.)
Post a comment